Electric Vehicles are becoming more and more popular across Indiana, so planning for EV charging infrastructure during new construction has become a strategic priority for developers to attract a whole new type of customer to their developments. Whether you're building a retail complex, multi-family housing, office space, industrial fleet facility, or mixed-use property, incorporating EV-ready electrical systems during the design and construction phase can save significant time and money.
Why Plan EV Charging During Construction?
1. It’s Cheaper Than Retrofitting
Adding EV chargers after a building is complete often requires:
- Trenching or re-pouring concrete
- Running new conduit through walls or underground
- Upgrading electrical panels or transformers
Planning EV infrastructure before construction reduces material, labor, and permitting costs.
2. Building Codes Are Moving Toward EV Requirements
Cities across the U.S. are starting to require:
- EV-ready conduit
- Dedicated charging parking spaces
- Load-sharing infrastructure
Getting ahead of evolving standards protects your project from future compliance headaches.
3. It Increases Property Value and Market Appeal
Commercial spaces that include EV charging are more attractive to:
- Tenants
- Corporate clients
- Residential buyers
- Municipal partners
Future-proofing is a selling point.
Determining Charger Types
EV charging options generally fall into two categories:
Level 2 Charging
- Ideal for apartments, workplaces, and hotels
- Provides steady, reliable charging for longer stays
- Lower electrical demand than DC Fast Charging
Level 3 / DC Fast Charging
- Ideal for travel centers, convenience stores, and fleet facilities
- Enables rapid, high-throughput charging
- Requires substantial electrical capacity planning
Early planning ensures that utility service sizing matches projected demand.
Electrical Considerations in New Construction
Key electrical planning steps include:
- Load calculations and capacity forecasting
- Utility service coordination
- Space allocation for transformers and switchgear
- Conduit routing and parking layout integration
- Smart load-balancing systems to reduce demand costs
The earlier these are incorporated, the more efficient and cost-effective the build.
Parking Layout Planning
Proper planning ensures chargers:
- Are accessible
- Meet ADA height and clearance requirements
- Are protected from vehicle impact
- Include space for future expansion
It’s always easier to build room for future chargers than to retrofit them later.
Monetization and Management Systems
Commercial EV charging can be:
- Free to users
- Pay-per-use
- Membership-based
- Integrated into tenant billing
Choosing the right network platform affects:
- Access control
- Usage data tracking
- Energy demand management
- Payment processing
Available Incentives for New Construction Projects
Indianapolis businesses may qualify for:
- Federal EV infrastructure tax credits
- Utility rebates for EV-ready site wiring
- Green building grants or credits
- Fleet electrification funding programs
These incentives can significantly reduce upfront installation costs. EV charging is quickly becoming an expected feature of modern commercial development.
Planning for chargers during new construction:
- Reduces cost and complexity
- Future-proofs the property
- Increases leasing demand and tenant satisfaction
- Aligns with long-term sustainability goals
If you're planning a new commercial development in Indianapolis, now is the perfect time to integrate EV charging infrastructure into your project design.